Carpenters Ltd Glossop - Phase 1 |  | Client: | Carpenters Ltd | Value: | £1.4 million | Programme: | 22 weeks | Thomas Barnes were appointed, as a result of the successful completion of the project above, to extend the facilities by way of a 50,000 sq ft building. Following demolition of the boiler house and utility stores, the extension consisted of a single storey triple span portal frame. |
| | | Carpenters Ltd Glossop - Phase 2 |  | Client: | Carpenters Ltd | Value: | £2.3 million | Programme: | 36 weeks | Part of an on-going phased programme, this 80,000 sq ft production and distribution depot was constructed on a contaminated site.
After stripping, a stone mat was laid in the floor slab and foundation areas and vibro-compacted. Traditional concrete bases and pre-cast ground beams were used.
The superstructure is a 4 bay steel portal frame, steel sheet clad with roller shutters. |
| | | Heywood Distribution Park, Unit B4 |  | Client: | Ropemaker Properties Ltd | Value: | £450,000 | Programme: | 8 weeks | Areas of damaged vertical cladding were reinstated as well as repairs to internal and external brick & block walls with metal gutters being repainted and downspouts replaced. Roof sheets / lights have been replaced and the entire buildings exterior repainted.
Internally, offices have been reconfigured and toilet areas upgraded. |
| | | Regatta Warehouse, Trafford Park |  | Client: | Regatta | Value: | £2.2 million | Programme: | 28 weeks | The design & build scheme comprises a 50,000 sq ft single span warehouse, with 16m to eaves high bay racking system, loading docks and canopies.
Internally, a 2-storey office area was constructed. The warehouse was protected with roof and in-rack sprinkler system. |
| | |
|
|
|
|
|
|
|